Grid Emergency: 40% No-Shows. We Fix That.

Turn your 40% failure rate into the 90% success story your board celebrates

Calculate Your Savings

Calculate Your Utility's Savings

60%
50 hours
$2.4M
Annual savings with 90% response rates vs current performance
Equivalent to avoiding 12 layoffs + deferring new grid investment
See How Much YOUR Utility Could Save

The Infrastructure Battle

Old Way: Wasteful Peaker Plants

$2B

New Infrastructure Cost

Used only 50 hours/year
Takes 5+ years to build
Massive environmental impact

GiT Way: Smart Demand Response

$0

New Infrastructure Cost

Available 24/7/365
Deploy in 30-60 days
Uses existing customer assets

When 35% Response Becomes Your Problem

It's 3 PM on the hottest day of the year. The grid operator calls an emergency event.

"Why did only 35% of our participants respond when we needed them most?"
"How do I explain to the board why our $3M DR program failed during the emergency?"
"The neighboring utility got 85% response - what are they doing that we're not?"
The Hidden Career Cost: Utility executives who can't deliver reliable demand response during emergencies don't get promoted. They get replaced.

From Utility Failure to Conference Keynote

The Crisis: Summer 2023

A major municipal utility's DR program collapsed during a record heat wave. Only 38% of enrolled participants responded to emergency events. The utility had to purchase emergency power at $400/MWh while customers complained about rolling blackouts.

The board meeting was brutal: "We invested $4.2M in this program and it failed when we needed it most. Fix it or we're canceling the whole thing."

The Transformation: 90 Days Later

Same utility, same customers, completely different results. During the next major heat wave, they achieved 91% participant response rates. No emergency power purchases. No rolling blackouts. No angry customers.

The board meeting afterward: "This DR program just saved us $2.8M in a single week. Let's expand it to our entire territory."

Six months later: The DSM manager was invited to present their success story as the keynote speaker at the PLMA Conference.

What Changed?

One thing: Weekly payments that kept participants engaged year-round instead of frustrated and forgotten between seasons.

When the next emergency hit, participants didn't ignore the call - they were already invested in the program's success because they'd been earning money every week and knew exactly how it worked.

The Platform That Makes Utility Managers Heroes

Emergency Reliability

90%+ Response When Grid Operators Actually Need It

  • Participants stay engaged year-round, not just during peak season
  • Real-time monitoring shows exactly who's responding during events
  • Grid operators can count on your capacity like a traditional power plant

Regulatory Protection

Automated Compliance That Never Fails

  • Undeniable documentation for every participant and every event
  • Compliance reports generated automatically in minutes, not weeks
  • Rock-solid evidence of delivered capacity for resource planning

Career Protection

Never Explain Program Failures to Your Board Again

  • 85% participant retention vs. 40% industry average
  • Weekly settlements prevent the year-two participation collapse
  • Transform from the manager who explains failures to the one who delivers success

Metrics That Make Careers

How GiT platforms outperform traditional DR programs:

Industry Average 38%
With GiT 91%
Emergency Response Rate
Most utilities accept 40% as "good enough"
Emergency Power $400
With GiT $50
Cost per MWh
Same day, same grid, 8x cost difference
Industry Standard 6-8mo
With GiT 7 days
Settlement Speed
Faster payments = higher retention
Year 2 Average 40%
Year 2 GiT 85%
Participant Retention
Most programs lose 60% after first year

*Industry averages from SEPA 2023 Demand Response Report, FERC Assessment of Demand Response, and utility rate case filings 2020-2023

Get the 90-Day Transformation Blueprint

Turn your DR program into a board room success story

Blueprint delivered in 24 hours. Complete roadmap with ROI calculations and pilot overview. Consultation only if requested.